Construction payables break in ways that general small-business guidance does not cover. A bill belongs to a job, not to an expense category. Retainage is held back on some invoices and not others. A subcontractor sends a progress billing statement rather than an invoice. And one job carries costs from five trades at once. The workflow has to carry a job number through every line, and it has to recognise the documents that are not bills at all.

  • By BillToCSV
  • 8 min read

General information for bookkeepers, not accounting, tax or legal advice. Rules and software screens differ by country and change over time.

General information about payables workflows in construction. Retainage and progress billing rules vary by contract and by jurisdiction, and tax treatment of a construction bill depends on the work and the place. Neither is advice, and both belong with your accountant and your contract documents.

Why construction payables is a different job

In most small businesses a supplier invoice maps to one account. In construction it maps to one job and one cost type, and the supplier matters less than the job does. A cement delivery for a specific site is not an expense; it is the cost of a specific structure at a specific address, and the number has to arrive at that job rather than in a general materials account.

That single difference is what breaks most standard imports. A column set built for a bookkeeper has no field for a job number, so the job either goes in the description, where nobody can total by it, or it is lost and the cost lands in whichever account the file happened to carry.

The documents a construction office actually receives

Not every document that arrives is an invoice, and treating the ones that are not as if they were is the most expensive mistake in the trade.

Documents a construction payables clerk handles, and what each one is
DocumentWhat it really isHow to handle it
Supplier invoice with a job number on itA bill for goods or services already delivered.Post it against the job, with the cost type and the job number carried on every line.
Subcontractor progress billing statementA request for payment for work completed to date, often with a schedule of stored materials.Check it against the contract schedule before posting. The line detail may not match your job cost structure at all.
Retainage invoiceA bill for completed work where part of the amount is held back.Post the full invoice and track the held-back portion separately. Whether retainage is a liability or set-off depends on the contract and the law where the work is done.
Timesheet or labour summaryA record of hours, not a request for money.Do not post it as a bill. It feeds a pay run or a progress claim, and posting it twice is a common and expensive error.
Materials delivery docketProof that something was delivered to site.Usually not a bill on its own. Match it to the supplier invoice rather than posting both.
Variation or change-order documentAn agreement to change scope or price.Post against the right job and cost type, and keep it with the contract file. Variations are the part of the job most likely to be queried later.

A workflow that carries the job number through

  1. Decide where the job number lives

    Decide this before you import anything. The usual choice is a dedicated job number column, with the cost type in a second column. A description field is not a job number, because nobody can total by a description.

  2. Map the cost types once, not per bill

    Materials, labour, plant, subcontract, waste, professional fees and site costs cover most trades. Record the mapping per supplier so it is applied the same way every time.

  3. Check the arithmetic before the job split

    Quantity times unit price against the printed line amount, lines against the subtotal, subtotal plus tax against the total. On a construction bill the tax line is often the least reliable number on the page, so check it rather than trust it.

  4. Treat progress statements as a separate path

    They need checking against the contract schedule, not just arithmetic. Keep them out of the same queue as ordinary invoices, or the clerk will start approving them on the same quick glance.

  5. Reconcile the job, not just the ledger

    At the end of the month, total the costs by job and compare with what the project report expects. A ledger that balances can still be attached to the wrong job.

What goes wrong

Job numbers typed into the description

It works for a month and then stops working, because no one can total costs by job any more. The job belongs in its own column.

Progress statements posted as invoices

The line detail does not match your cost structure, so the job total is wrong even though the ledger balances. Check against the contract schedule first.

Retainage posted as a discount

The money has not been deducted; it has been withheld. If it lands as a discount the project appears to have cost less than it did.

The same delivery docket paid twice

A docket and an invoice for the same materials both arrive, and both get posted. Match dockets to invoices before posting.

Tax treated as the same on every job

Tax on construction work depends on the work and where it is done, and it varies between residential and commercial work. Read the rate off the document rather than assuming.

The part worth doing by hand

  • The first invoice from a new subcontractor. Read it against the contract, once, and write the mapping down. Every later invoice from them then follows a rule rather than a fresh decision.
  • Any bill where a line does not multiply out. On a construction bill that is often a genuine dispute about quantity delivered, not a rounding difference. Leave the printed number and record what you think it means.
  • Anything with a variation attached. The invoice alone does not tell you whether the work was ordered. The change order does, and it is the document that answers the question six months later.

How BillToCSV helps

BillToCSV reads subcontractor invoices and supplier bills from PDFs and photos and writes bill import CSVs with the arithmetic checked on every line, ready for your job cost code and cost type columns. See the QuickBooks converter, the blank templates and pricing. Free: browser review for one supported invoice up to 10 pages and 10 MB, without signup.

Questions people ask

How do construction jobs get their own column in a bill import?

You add it. A standard bill import has a memo and a description column, and neither is a job number, because neither can be totalled. If your accounting software lets you extend the import, add a job number column and a cost type column; if it does not, keep the numbers in a sheet beside the file until the ledger can carry them.

Is retainage tax deductible in the same way as the rest of the bill?

This is a question for your accountant, because it depends on your contract and on the law where the work is done, and because retainage is a held-back amount rather than a discount. Post the invoice as billed and track the retained portion separately.

Should a subcontractor progress billing statement be posted as a bill?

Only after you have checked it against the contract schedule. A progress statement asks for money and carries its own line detail, and that detail is often structured for the contract rather than for your cost codes. Post it against the right job, and keep it in a separate queue from ordinary invoices.

What is the most common construction payables mistake?

Paying twice for the same materials, because a delivery docket and the supplier invoice for it were both posted. Match the docket to the invoice, and post the invoice only.

How many bills can I do on the free allowance?

Three bills on the house, 20 pages a bill, 30 pages in total, no sign-up. On a construction job that runs across several trades, a month of invoices is well over that, so a paid plan is usually the practical choice. See pricing.

Does BillToCSV understand retainage or progress billing?

It reads the lines, the header and the arithmetic on the document. It does not interpret a contract, decide what is retainable, or know your contract schedule. Those decisions stay with you, which is the correct division of the work.